Projects

A sampling of our work.

5th Street Bikelanes

City of Highland, San Bernardino and Highland, California

This 6 mile long grant project provided a continuous Class II bikelane from Tippecanoe Avenue easterly to the limits of the City of Highland. Street improvement and striping and signage plans were prepared to create this accessible bike route.

Baseline Improvement Project

Highland, California

8th & Vineyard Development

DCT Industrial, Rancho Cucamonga, California

This 20 acre development located between 8th and 7th Streets is comprised of a triangular shaped piece adjacent to a flood control channel. Five warehouse buildings, ranging in size from approximately 150,000sf to 50,000sf, were constructed with related parking and underground utilities for logistics operation. On-site grading and drainage and utility plans were prepared as well as street improvement plans for both 7th and 8th Street. Two parcels maps were recorded on the property: one to originally subdivide the property into 11 parcels and the second to consolidate the property into the final 5 parcel configuration.

Belmont and Grove Industrial Park

Ontario, California

Parking Structure and Police Building

California Polytechnic University, Pomona, California

Located within the existing surface parking lots at the northeasterly corner of the property, this 6-story parking structure was created to generate 2,388 spaces for students. Grading plans and underground utility plans were prepared to service all fire and domestic uses of this structure and the adjacent campus police building.

Signature Center

Rancho Cucamonga, California

Fontana Senior Housing Project

Fontana Redevelopment Agency, Fontana, California

Located on 8 acres in downtown Fontana, the city’s redevelopment agency organized the construction of approximately 150 affordable housing units along Sierra Avenue. Grading plans, drainage and utility plans were prepared for the building and associated parking lot design as well as public street improvements. A parcel map combining multiple parcels into a single parcel was also processed.

Upland Fire Station

Upland, California

Greenspot Road Street Improvement

City of Highland, Highland, California

Described as the gateway to the City, this project widened the existing 4-lane road to a divided 6-lane highway with landscaped medians and parkways. The 1.1 mile length of roadway included 8,000lf of new storm drain pipe and an outlet connection to nearby City Creek. Street improvement and utility plans were prepared as well as coordination provided with various agencies for this development including utilities agencies, San Bernardino County Flood Control District, Department of Fish and Widelife, U.S. Army Corp of Engineers and California Department of Transportation (Caltrans).

Heritage Square

Tharaldson Development, Rancho Cucamonga, California

Tharaldson Development, one of the largest hotel developers in the US, created a master site development on approximately 15 acres to build three hotels and four supporting retail/restaurant buildings. Demolition plans as well as on-site grading, drainage and utility plans were prepared including public improvement plans for the adjacent streets. This site incorporates the first newly constructed hotels in the City of Rancho Cucamonga in over two decades.

SEC Euclid Building

Westate Holdings Group, Ontario, California

This 1.2 acre development near the heart of downtown Ontario at the intersection of Holt and Euclid (State Route 83), created the first three story office structure in many years. On-site grading and drainage plans as well as utility plans were prepared for this intricate site. Public improvements included street improvement plans processed with the City of Ontario as well as Caltrans.

CSUSB Student Union Expansion

California State University San Bernardino, California

This expansion of the existing student union included both interior and exterior improvements. Grading plans and drainage plans were prepared to properly service the new structure.